The Problem: Shovel teeth, nails, nuts and bolts, and the like were continually damaging a crusher processing limestone at American Cement Company.
The Equipment: Eriez Suspended Electromagnet
The Solution: The cement company installed an Eriez 30-inch x 55-inch Suspended Electromagnet over a conveyor. It replaced an elaborate metal detection system provided by another company that wasn’t doing the job.
The Result: All tramp iron was effectively and quickly removed by the suspended magnet at the rate of 400 tons per hour.